Latest market news

Aurizon cuts Australian coal haulage guidance

  • : Coal, Coking coal
  • 24/02/12

Australian rail firm Aurizon has cut its coal volume guidance for the 2023-24 fiscal year to 30 June, as the end of mining at Wilkie Creek and wider coal mine production problems offset output increases at Olive Downs and New Acland.

Aurizon had targeted to increase coal haulage by 10pc in 2023-24 from the 185mn t it hauled in 2022-23 but revised that to 5pc year-on-year growth when it announced its half-year results on 12 February. This implies a target of 194mn t for 2023-24. It hauled 94mn t during July-December, leaving it a target of 100mn t for January-June.

Wet weather in Queensland in late December, through January and into February has disrupted some operations in the wider coal industry. But it has been less disruptive to Aurizon's coal operations than previous Queensland wet seasons, the firm's managing director Andrew Hardy said. The firm hauled 94.5mn t of coal during January-June 2023 when flooding cut access to some mines.

Aurizon's August guidance of 10pc growth in haulage was based partly on a contract to deliver coal from the 2.4mn t/yr New Wilkie mine near Dalby, Queensland but mining has stopped after the operator entered administration. Aurizon is still talking with the receivers and some cargoes are being loaded from stocks but full contract volumes are unlikely to be met.

Haulage increased by 70pc during July-December compared with a year earlier on the West Morton line, as New Hope increased production at its New Acland mine. It was also up for New South Wales (NSW), Moura and Blackwater lines because of drier conditions than a year earlier. This was offset by 16pc and 6pc lower haulage on the Newlands and Goonyella lines respectively.

Newlands runs south from Abbot Point port to North Goonyella, servicing Glencore's 2.5mn t/yr Collinsville thermal coal mine and a handful of mines owned by Australian mining firm QCoal. Goonyella runs west from the adjacent ports of Hay Point and Dalrymple Bay Coal terminal to join with Newlands at North Goonyella, servicing more than 20 mines in the Bowen basin.

Aurizon started hauling coal for the 4.5mn t/yr Olive Downs metallurgical coal mine in January, which will travel on the Goonyella line.

Aurizon is operating at around 82pc utilisation rates, up from 78pc during the Covid-19 pandemic and is aiming to return to 90pc. But it is facing competition from BMA rail in Queensland and Magnetic Rail in NSW, as well as Pacific National in both states.

Aurizon coal haulage (mn t)
Jul-Dec '23Jan-Jul '23Jul-Dec '22
Central Queensland Coal Network
Newlands6.78.18.0
Goonyella28.030.429.7
Blackwater24.021.922.5
Moura7.76.36.7
Total66.366.766.9
NSW and SE Queensland
West Moreton1.71.11.0
Hunter valley/Illawarra26.026.722.6
Total27.727.823.6
Total coal94.094.590.5
Totals may not add up because of rounding

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

24/12/26

Viewpoint: US gas market poised for more volatility

Viewpoint: US gas market poised for more volatility

New York, 26 December (Argus) — US natural gas markets may be subjected to more dramatic price swings in 2025 as growing LNG exports and increasingly price-sensitive producers place greater pressure on the US' stagnant gas storage capacity. Those price swings could pose challenges for consumers without ample access to gas supplies, as well as producers interested in keeping some output unhedged to capture potentially higher prices without taking on excessive financial risk. But volatility may also present opportunities for traders looking to exploit unstable price spreads, and for producers that can adapt their operations to fit a more unpredictable pricing environment. Calm before the storm High storage levels and low spot prices this year — averaging $2.11/mmBtu through November this year at the US benchmark Henry Hub — triggered by an unusually warm 2023-24 winter, may have obscured some of the structural factors pushing the US gas market into a more volatile future. But those structural factors remain and loom increasingly large for prices. The US has moved from a roughly 60 Bcf/d (1.7bn m³/d) market eight years ago to a more than 100 Bcf/d market today, "and we haven't grown our storage capacity at all", Rich Brockmeyer, head of North American gas and power at commodity trading house Gunvor, said earlier this year. As supply and demand for US gas grow, the country's roughly 4.7-Tcf storage capacity becomes ever less effective in stemming demand shocks, such as extreme winter weather events, which can more rapidly draw down inventories than in years past. Additionally, a growing share of US gas is being consumed by LNG export terminals being built and expanded on the US Gulf coast. When those facilities encounter unexpected problems and cease operations — as has happened numerous times at the 2 Bcf/d Freeport LNG terminal in Texas in recent years — volumes that were previously being liquefied and sent overseas were instead backed up into the domestic market, crushing prices. More LNG exports may mean more opportunities for such supply shocks. US LNG exports are expected to increase by 15pc to almost 14 Bcf/d in 2025 as operations begin at Venture Global's planned 27.2mn t/yr Plaquemines facility in Louisiana and Cheniere's 11.5mn t/yr Corpus Christi, Texas, stage 3 expansion, US Energy Information Administration data show. Spot price volatility will be most acutely felt in regions like New England that lack underground gas storage. "In areas like the Gulf coast, where you have a lot of storage, it won't be a problem," Alan Armstrong, chief executive of Williams, the largest US gas pipeline company, told Argus in an interview. Producers' trade-off Volatile gas markets are a mixed bag for producers, many of whom profit from volatility while also struggling to plan and budget based on uncertain revenues for unhedged volumes. Though insufficient gas storage deprives the market of stability, "from the standpoint of a marketing and trading guy that's trying to manage my gas supply to customers and my trading book, I love volatility",said Dennis Price, vice president of marketing and trading at Expand Energy, the largest US gas producer by volume. BP chief financial officer Sinead Gorman in November 2023 specifically named Freeport LNG's eight-month-long shutdown in 2022-23 from a fire as a driver of volatility in the global gas market. The supermajor was able to exploit the "incredibly fragile" gas market, she said, which was a key factor driving the success of its integrated gas business. "Those opportunities are what we typically seek and enjoy," Gorman said. Increasingly, producers have also been adapting to a more volatile market by switching production on and off in response to prices, but often without revealing the price at which a supply response will occur. Expand Energy, for instance, told investors in October that it was amassing drilled but uncompleted wells and wells that had yet to be brought on line, which it could activate relatively quickly when prices rise. It declined to name the price at which that would occur. Market participants, attempting to price in this phenomenon by anticipating producers' next moves may respond more dramatically to supply signals than in the past, when production was steadier. Producers' increased responsiveness to prices could help to balance the market somewhat, though more aggressive intervention into operations could take a toll on well performance and pipelines, FactSet senior energy analyst Connor McLean said. Producers are "treating the reservoir itself like a storage facility", Price said. By Julian Hast Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Japan’s Chugoku restarts Shimane nuclear reactor early


24/12/23
24/12/23

Japan’s Chugoku restarts Shimane nuclear reactor early

Osaka, 23 December (Argus) — Japanese utility Chugoku Electric Power restarted the 820MW Shimane No.2 nuclear reactor for test operations on 23 December, two days earlier than originally planned. The No.2 reactor at Shimane in west Japan's Shimane prefecture was reconnected to the country's power grids for the first time in nearly 13 years, after the reactor shut down in January 2012 for stricter safety inspections following the 2011 Fukushima nuclear meltdown disaster. Chugoku reactivated the Shimane No.2 reactor on 7 December, aiming to resume power generation on 25 December. But the target date for commercial operations remained unchanged on 10 January, despite the earlier than expected restart. The Shimane No.2 reactor will be a vital power source as the sole nuclear fleet in the Chugoku area, to help enhance the resilience of the power supply structure, stabilise retail electricity prices and reduce CO2 emissions, said Japan Atomic Industrial Forum's president Hideki Masui on 23 December. The Shimane No.2 reactor is the second boiling water reactor (BWR) to be restarted after the Fukushima disaster, following the 825MW Onagawa No.2 BWR unit that resumed test generation on 15 November, with normal operations scheduled to restart on 26 December. The BWR is the same type as that involved in the meltdown at the Fukushima Daiichi plant. The restart of the two BWRs would pave the way for Japan's nuclear restoration, as 15 BWRs — including advanced BWRs — are still closed in the wake of the Fukushima disaster. Japan has restored 14 reactors as of 23 December, including the Shimane and Onagaw reactors, of which 12 are installed with a pressurised water reactor (PWR) design. Nuclear power's share The Japanese government last week set a target of 20pc for nuclear power's share in the country's draft power mix for the April 2040-March 2041 fiscal year, under the triennial review for the country's Strategic Energy Plan (SEP). Tokyo is seeking to restart all existing reactors to achieve the 20pc goal, adding that replacement reactors would also be possible. The draft SEP allows nuclear power operators that had decommissioned reactors to build next-generation reactors at their nuclear sites, not limited to the same site. The previous SEP did not mention building new reactors or replacements. Japan's Federation of Electric Power Companies (FEPC) has applauded this progress, but FEPC chairman Kingo Hayashi noted that it was disappointing the SEP did not mention a nuclear capacity target which the FEPC had requested. It also did not include building new reactors or the expansion of existing nuclear plants, Hayashi added. By Motoko Hasegawa Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

US government agencies set to shut down


24/12/20
24/12/20

US government agencies set to shut down

Washington, 20 December (Argus) — US federal agencies would have to furlough millions of workers and curtail permitting and regulatory services if no agreement is reached by Friday at 11:59pm ET to extend funding for the government. US president-elect Donald Trump and his allies — including Tesla chief executive Elon Musk — on 18 December upended a spending deal US House of Representatives speaker Mike Johnson (R-Louisiana) had negotiated with Democratic lawmakers in the House and the Senate. Trump endorsed an alternative proposal that Johnson put together, but that measure failed in a 174-235 vote late on Thursday, with 38 Republicans and nearly every Democrat voting against it. Trump via social media today indicated he would not push for a new funding bill. "If there is going to be a shutdown of government, let it begin now, under the Biden Administration, not after January 20th, under 'TRUMP,'" he wrote. There was little to indicate as of Friday morning that Trump, Republican congressional leadership and lawmakers were negotiating in earnest to avert a shutdown. The House Republican conference is due to meet in the afternoon to weigh its next steps. President Joe Biden said he would support the first funding deal that Johnson negotiated with the Democratic lawmakers. "Republicans are doing the bidding of their billionaire benefactors at the expense of hardworking Americans," the White House said. Any agreement on funding the government will have to secure the approval of the House Republican leadership and all factions of the Republican majority in the House, who appear to be looking for cues from Trump and Musk on how to proceed. Any deal would then require the support of at least 60 House Democrats to clear the procedural barriers, before it reaches the Senate where the Democrats hold a majority. The same factors will be in play even if the shutdown extends into early 2025. The Republicans are set to take the majority in the Senate when new Congress meets on 3 January. But their House majority will be even slimmer, at 219-215, requiring cooperation of Democratic lawmakers and the Biden administration. What happens when the government shuts down? Some agencies are able to continue operations in the event of a funding lapse. Air travel is unlikely to face immediate interruptions because key federal workers are considered "essential," but some work on permits, agricultural and import data, and regulations could be curtailed. The US Federal Energy Regulatory Commission has funding to get through a "short-term" shutdown but could be affected by a longer shutdown, chairman Willie Phillips said. The US Department of Energy, which includes the Energy Information Administration and its critical energy data provision services, expects "no disruptions" if funding lapses for 1-5 days, according to its shutdown plan. The US Environmental Protection Agency would furlough about 90pc of its nearly 17,000 staff in the event of a shutdown, according to a plan it updated earlier this year. The Interior Department's shutdown contingency plan calls for the Bureau of Land Management (BLM) to furlough 4,900 out of its nearly 10,000 employees. BLM, which is responsible for permitting oil, gas and coal activities on the US federal land, would cease nearly all functions other than law enforcement and emergency response. Interior's Bureau of Safety and Environmental Enforcement, which oversees offshore leases, would continue permitting activities but would furlough 60pc of its staff after its funding lapses. The US Bureau of Ocean Energy Management will keep processing some oil and gas exploration plans with an on-call group of 40 exempted personnel, such as time-sensitive actions related to ongoing work. The shutdown also affects multiple other regulatory and permitting functions across other government agencies, including the Departments of Agriculture, Transportation and Treasury. By Haik Gugarats Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Trump backs new deal to avoid shutdown: Update


24/12/19
24/12/19

Trump backs new deal to avoid shutdown: Update

Adds updates throughout Washington, 19 December (Argus) — US president-elect Donald Trump is offering his support for a rewritten spending bill that would avoid a government shutdown but leave out a provision authorizing year-round 15pc ethanol gasoline (E15) sales. The bill — which Republicans rewrote today after Trump attacked an earlier bipartisan agreement — would avoid a government shutdown starting Saturday, deliver agricultural aid and provide disaster relief. Trump said the bill was a "very good deal" that would also include a two-year suspension of the "very unnecessary" ceiling on federal debt, until 30 January 2027. "All Republicans, and even the Democrats, should do what is best for our Country, and vote 'YES' for this Bill, TONIGHT!" Trump wrote in a social media post. Passing the bill would require support from Democrats, who are still reeling after Trump and his allies — including Tesla chief executive Elon Musk — upended a spending deal they had spent weeks negotiating with US House speaker Mike Johnson (R-Louisiana). Democrats have not yet said if they would vote against the new agreement. "We are prepared to move forward with the bipartisan agreement that we thought was negotiated in good faith with House Republicans," House minority leader Hakeem Jeffries (D-New York) said earlier today. That earlier deal would have kept the government funded through 14 March, in addition to providing a one-year extension to the farm bill, $100bn in disaster relief and $10bn in aid for farmers. The bill would also provide a waiver that would avoid a looming ban on summertime sales of E15 across much of the US. Ethanol industry officials said they would urge lawmakers to vote against any package without the E15 provision. "Pulling E15 out of the bill makes absolutely no sense and is an insult to America's farmers and renewable fuel producers," Renewable Fuels Association chief executive Geoff Cooper said. If no agreement is reached by Friday at 11:59pm ET, federal agencies would have to furlough millions of workers and curtail services, although some agencies are able to continue operations in the event of a short-term funding lapse. Air travel is unlikely to face immediate interruptions because key federal workers are considered "essential," but some work on permits, agricultural and import data, and regulations could be curtailed. The US Federal Energy Regulatory Commission has funding to get through a "short-term" shutdown but could be affected by a longer shutdown, chairman Willie Phillips said. The US Department of Energy expects "no disruptions" if funding lapses for 1-5 days, according to its shutdown plan. The US Environmental Protection Agency would furlough about 90pc of its nearly 17,000 staff in the event of a shutdown, according to a plan it updated earlier this year. By Chris Knight Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

US Congress passes waterways bill


24/12/19
24/12/19

US Congress passes waterways bill

Houston, 19 December (Argus) — The US Senate has passed a bipartisan waterways infrastructure bill, providing a framework for further investment in the country's waterways system. The waterways bill, also known as the Water Resources and Development Act (WRDA), was approved by the Senate in a 97-1 vote on 18 December after clearing the US House of Representatives on 10 December. The WRDA's next stop is the desk of President Joe Biden, who is expected to sign the bill. The WRDA has been passed every two years, authorizing the US Army Corps of Engineers (Corps) to undertake waterways infrastructure and navigation projects. Funding for individual projects must still be approved by Congress. Several agriculture-based groups voiced their support for the bill, saying it will improve transit for agricultural products on US waterways. The bill also shifts the funding of waterways projects to 75pc from the federal government and 25pc from the Inland Waterways Trust Fund instead of the previous 65-35pc split. "Increasing the general fund portion of the cost-share structure will promote much needed investment for inland navigation projects, as well as provide confidence to the industry that much needed maintenance and modernization of our inland waterway system will happen," Fertilizer Institute president Corey Rosenbusch said. The bill includes a provision to assist with the damaged Wilson Lock along the Tennessee River in Alabama. By Meghan Yoyotte Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Generic Hero Banner

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more