Latest market news

India gears up for peak power demand in April

  • : Coal, Electricity, Natural gas
  • 23/03/10

The Indian power ministry is stepping up preparations, with India facing a peak power demand forecast of 229GW in April with the onset of summer.

Several states already witnessed record-high temperatures in February. The India Meteorological Department has indicated that summers months are likely to be hotter, predicting heat waves between March and May.

The government has invoked an emergency rule that enables some of the biggest coal-fired power plants to operate at full capacity. It has directed power utilities to carry out maintenance for coal-fired power plants in advance to avoid any maintenance shutdown during the crunch period.

All imported coal-fired power plants are to run at full capacity from 16 March as the power ministry aims to buy 1,500MW of coal-fired electricity capacity using imported coal to meet an anticipated deficit during the peak summer month. The government earlier this year ordered utilities to import 6pc of their thermal coal requirements for blending until September.

An additional capacity of 2.92GW of newly commissioned coal-fired power plants is likely to be operational by the end of March, besides two units with a coal-fired power capacity of 110MW each at Barauni in east India's Bihar state during the crunch period, according to a government notification on 9 March. The railway ministry is to provide 418 rakes and more to different subsidiaries of state-controlled Coal India (CIL), along with captive blocks to meet the coal required at plants.

Gas-fired power generation will also meet peak demand. State-controlled utility NTPC has been instructed to generate 5GW from its gas-fired power plants during April-May, in addition to 4GW of additional gas-fired power capacity that will be added by other entities.

State-controlled gas distributor Gail has already assured the power ministry that it will supply 248mn m³ of gas during the summer months.

But some in the market see a possible power shortage because of a hotter than usual summer this year.

"There is high probability of having a shortage of approximately 5GW during the month of April 2023 in the night-time peak demand hours wherein the requirement would be 216.9GW and the effective available capacity is expected to be 211.89GW," said associate vice-president of coal commercial strategy and regulatory affairs at Jindal Group Saunak Dey.

India's power consumption was 116.7TWh in February, up by 9pc from a year earlier, according to data from the power ministry. India's power consumption was 1,375.5TWh between April 2022 and February 2023.

Mumbai-based Crisil Market Intelligence and Analytics forecasts India's power consumption rising by 5.5-6pc in the April 2022-March 2023 fiscal year from over 1,320TWh a year earlier.

Available stocks

A total a 204GW of India's coal-fired thermal power plants had 33.85mn t of coal stocks left as on 7 March, which is sufficient for 12 days, data from the Central Electricity Authority showed.

To meet the rising summer demand, domestic coal requirements for April-June are expected to be 222mn t against anticipated supplies of 204.5mn t, Dey said, adding that the 6pc blending mandate will cover up the shortfall. But he also said that an approximate 1GW of coal-fired thermal generation capacity may also be forced to shut down in April.

A sharp rise in electricity consumption and tighter coal availability last year resulted in lengthy power cuts in parts of the country, prompting authorities to increase the supply of domestic coal to utilities. The Indian government also mandated CIL to import coal for the blending requirements of all domestic power utilities for the first time since 2015.

Coal accounted for 50pc of India's power generation feedstock in 2022. Gas' share was 6pc out of the 60bn m³ demand last year, the majority of which were for sectors including fertiliser and city gas.


Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

24/07/26

Eni confident on 2024 output, but Libya project slips

Eni confident on 2024 output, but Libya project slips

London, 26 July (Argus) — Executives at Italy's Eni are confident it will achieve the upper end of its 1.69mn-1.71mn production guidance for this year, but start-up of a key Libyan project is set to slip from 2026 into 2027. In a presentation of second-quarter earnings today, A&E Structure was one of two Libyan projects on a list of Eni's upcoming start-ups through to 2028 that will deliver some 740,000 b/d of oil equivalent (boe/d) of net production to the company. A&E Structure is a 160,000 boe/d gas development that will include some 40,000 b/d of liquids production, mainly condensate. A&E Structure is central to Libya's ability to sustain gas exports to Italy, which have dropped in recent years on a combination of rising domestic consumption and falling production. Supplies through the 775mn ft³/d Greenstream pipeline hit their lowest since the 2011 revolution in 2023, averaging 250mn ft³/d. The slide has continued since, with year-to-date volumes of around 160mn ft³/d on track for a record low. Eni's other upcoming Libyan project — the Bouri Gas Utilisation Project development that aims to capture 85mn ft³/d of gas at the 25,000 b/d offshore Bouri oil field — had already been pushed back from 2025 to 2026. For 2024 Eni expects to be "at the upper boundary of its guidance", according to chief operating officer of Natural Resources Guido Brusco. The company had a strong first half, during which output was 1.73mn boe/d — 5pc up on the year — thanks to good performance at assets in Ivory Coast, Indonesia, Congo (Brazzaville) and Libya. Brusco said Eni is in the process of starting up its 30,000 boe/d Cassiopea gas project in Italy, with first production expected next month, and the 45,000 b/d second phase of the Baleine oil project in Ivory Coast is expected to start by the end of this year. At Baleine, Brusco confirmed the two vessels to be used at phase two "will be in country in September and, building on the experience of phase one, we expect a couple of months of final integrated commissioning" before first oil. Eni also said today it would raise its dividend for 2024 by 6pc over 2023 to €1/share, and confirmed share repurchases this year of €1.6bn. It said there is potential for an additional buyback of up to €500mn, which is being evaluated this quarter. Eni's debt gearing is scheduled to fall below 20pc by the end of the year. Chief financial officer Francesco Gattei said these accelerated share buybacks would be possible if divestment deals are confirmed. By Jon Mainwaring and Aydin Calik Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Australia’s Ichthys LNG to restart liquefaction train


24/07/26
24/07/26

Australia’s Ichthys LNG to restart liquefaction train

Singapore, 26 July (Argus) — The second liquefaction train at Australia's 9.3mn t/yr Ichthys LNG export terminal plans to resume partial operations today, after going off line unexpectedly during 18-19 July, according to traders. The export facility is operated by Japanese upstream firm Inpex. Repairs at the affected train could take up to a month before it returns to full production, although the train is expected to restart by this weekend, according to market participants. Attempts to restart train two could take place by 26 July. Some delays to deliveries from the facility are expected, although there are also unconfirmed reports that up to two cargoes may have already been cancelled at the time of writing. The overall impact on the market is likely to be limited for now, with continuing weak spot demand from northeast Asian importers. Some term buyers previously requested for their deliveries to be deferred, traders said, although it is unclear just how many requests for deferment were received. But other participants have pointed out that the winter restocking season could soon start and any further impediments to train two's restart could lift prices. Recent temperatures in Japan have been higher than expected, with at least a 70pc probability of above-normal temperatures over the vast majority of the country until 23 August, according to the latest forecast issued by the Japan Meteorological Agency on 25 July. At least one Japanese utility may be considering spot purchases for August, owing to higher-than-expected power consumption because of warmer temperatures. But at least two other Japanese firms could be looking to sell a September and an October cargo each, traders said, which could indicate that the spot market is still sufficiently well-supplied to cope with additional demand from Japanese utilities. The 174,000m³ Grace Freesia departed from Ichthys on 25 July after loading an LNG cargo, according to ship tracking data from Kpler. The export terminal sold a spot cargo for loading over 2-6 June at around high-$9s/mn Btu through a tender that closed on 10 May, but further details are unclear. The US' 17.3mn t/yr Freeport export terminal also faced issues restarting since it was first taken off line on 7 July as a precautionary measure against Hurricane Beryl. The terminal loaded its first cargo on 21 July . All three trains are likely to be back on line as of 26 July, although production at the facility should still be closely monitored, traders said. By Naomi Ong Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Australia’s Empire Energy signs deal to sell gas to NT


24/07/26
24/07/26

Australia’s Empire Energy signs deal to sell gas to NT

Adelaide, 26 July (Argus) — Australian independent Empire Energy has signed an agreement to supply the Northern Territory (NT) with gas from its Carpentaria project in the onshore Beetaloo subbasin. Empire will supply NT with up to 25 TJ/d (668,000 m³/d) of gas over 10 years, starting from mid-2025. This equates to an estimated total supply of 75PJ (2bn m3) of gas. The deal includes scope for an additional 10 TJ/d for up to 10 years if production level at the Carpentaria plant exceeds 100 TJ/d. The firm bought domestic utility AGL Energy's dormant 42 TJ/d Rosalind Park gas plant late last yearwith plans to reassemble the facility on site at Carpentaria, subject to a final investment decision on the project. Gas will be delivered to the NT government-owned Power and Water (PWC) via the McArthur River gas pipeline on an ex-field take-or-pay basis, Empire said on 26 July. PWC in April signed an agreement to buy 8.6PJ of gas from Australian independent Central Petroleum , to supply gas-fired power generation and private-sector customers. Low production at Italian energy firm Eni's Blacktip field, offshore the NT, has led PWC to court new supply while providing a new outlet for prospective producers operating within Beetaloo. The largest Beetaloo acreage holder, Tamboran Resources, has revealed ambitious plans for a 6.6mn t/yr LNG plant to be located near Darwin Harbour's two existing LNG projects, using the basin's shale gas resources as feedstock. By Tom Major Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

South Africa adopts climate change law


24/07/25
24/07/25

South Africa adopts climate change law

Cape Town, 25 July (Argus) — South Africa's president Cyril Ramaphosa has signed into law the country's climate change bill, which sets out a national response to climate change for the first time. The new climate change act will enable the orderly reduction of greenhouse gas (GHG) emissions through the implementation of sectoral emission targets towards South Africa's commitment to reach net zero by 2050. Currently, the country is the 15th largest GHG emitter in the world, according to the World Resources Institute. The law provides policy guidelines to ensure South Africa reaches its nationally determined contribution (NDC) under the Paris climate agreement by assigning individual enterprises carbon budgets and facilitating public disclosure of their progress. In its updated 2021 NDC, the country has undertaken to cut its GHG emissions to 350mn-420mn t of CO2 equivalent (CO2e), equivalent to 19-32pc below 2010 levels, by 2030. The lower end of this range is in line with the Paris Agreement's 1.5°C global warming threshold. To meet this, South Africa will have to achieve a steep decline in coal-fired electricity generation. A carbon tax is seen as a vital component of the country's mitigation strategy, according to the president. "By internalising the cost of carbon emissions, carbon tax incentivises companies to reduce their carbon footprint and invest in cleaner technologies, and also generates revenue for climate initiatives," Ramaphosa said. South Africa's carbon tax was introduced in a phased approach in June 2019 at a rate of 120 rands/t ($7/t) of CO2 equivalent (CO2e) and increased to R134/t of CO2e by the end of 2022. But tax-free allowances for energy-intensive sectors such as mining, and iron and steel, along with state-owned utility Eskom's exemption, implied an initial effective carbon tax rate as low as R6-48/t of CO2e. South Africa's National Treasury is targeting an increase to $30/t of CO2e by 2030. But the extension of phase one from the end of 2022 to the end of 2025, together with an uncertain future price trajectory and lack of clarity on future exemptions, means the effective carbon tax rate is likely to remain well below the IMF's recommended $50/t of CO2e by 2030 for emerging markets. The new climate change act seeks to align South Africa's climate change policies and strengthen co-ordination between different departments to ensure the country's transition to a low-carbon and climate-resilient economy is not constrained by any policy contradictions. It outlines South Africa's planned mitigation and adaptation actions aimed at cutting GHG emissions over time, while reducing the risk of job losses and promoting new employment opportunities in the emerging green economy. The law also places a legal obligation on provinces and municipalities to ensure climate change risks and associated vulnerabilities are acted upon, while providing mechanisms for national government to offer additional financial support for these efforts. The new act formally establishes the Presidential Climate Commission (PCC) as a statutory body tasked with providing advice on the country's climate change response. Among other things, the PCC is developing proposals for a just transition financing mechanism, for which a platform will be launched in the next few months. Over the last three years, South Africa has seen an increase in extreme weather events often with disastrous consequences for poor communities and vulnerable groups. To address the substantial gap between available disaster funds and the cost of disaster response, the government announced in February that it would establish a climate change response fund. At the time of the announcement, Ramaphosa reiterated that South Africa would undertake its just energy transition "at a pace, scale and cost that our country can afford and in a manner that ensures energy security". Elaine Mills Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

US-Australia’s Coronado to lift coal sales


24/07/25
24/07/25

US-Australia’s Coronado to lift coal sales

Sydney, 25 July (Argus) — US-Australian coal producer Coronado Coal will boost coal sales during July-December despite logistical challenges, as it maintains its output guidance of 16.4mn-17.2mn t for 2024. The firm sold 7.8mn t of coal during January-June, leaving it a target of 8.6mn t for July-December to meet the bottom of its 2024 guidance . It has maintained this guidance despite warning that shipments from its Australian Curragh mine will be affected by a two-week rail disruption from the end of July . Coronado operates the Curragh mine in Queensland and two mining complexes in the US' Virginia. All produce coking and thermal coal. Coronado's revenues were supported during April-June compared with January-March by a smaller discount for pulverised injection coal (PCI) against hard coking coal prices, which saw the PCI price rise while other metallurgical coal prices were under pressure. Its sales prices will remain strong in July-September, forecasts chief executive Douglas Thompson, on restocking in India and the rail disruption in Queensland, as well as the fire at Anglo American's Grosvenor mine that will disrupt Australian exports. Thompson warned that there was some downside risk of $5-10/t to Australian PCI pricing but if this was realised it will see China restart buying from Australia. In the long term he expects more competition from Russia-origin PCI, as Russian coal producers find new routes to the seaborne market and regain market share lost because of an European embargo. The premium for premium hard coal prices over PCI coal prices has shrunk to around $30/t from $145/t over the past six months. Argus last assessed the premium hard low-volatile price at $224/t fob Australia on 24 July and the PCI low-volatile price at $193.65/t. Coronado's group sales volumes were up 8.3pc to 4.1mn t in April-June compared with January-March , reflecting higher sales from its Australian and US operations. The increase in volumes combined with reduced need to remove waste materials allowed Coronado to cut is mining costs by 27.5pc from the previous quarter to an average of $91.10/t of coal sold. The firm expects costs to fall further in July-December as it demobilises more of its mining fleet at its Curragh mine. This reflects reduced waste removal and should have no impact of coal production at Curragh, Thompson said. Production at Curragh should increase in the second half of 2024, with 100,000t of coal production deferred from June to July because of heavy rainfall. By Jo Clarke Coronado Coal (mn t) Apr-Jun '24 Jan-Mar '24 Apr-Jun '23 Jan-Jun '24 Jan-Jun '23 Sales (mn t) Australia (Curragh) 2.7 2.5 2.5 5.2 4.7 US 1.4 1.2 1.5 2.6 3.0 Total 4.1 3.7 4.0 7.8 7.6 Sales data % coking coal of total sales 81.0 78.7 76.0 79.9 75.3 Australian realised met coal price (fob) ($/t) 216.2 225.2 237.7 220.5 239.7 US realised met coal price (for) ($/t) 161.7 170.9 196.0 166.0 215.5 Source: Coronado Australian coal price comparisons ($/t) Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more