Latest market news

Greece expects 70pc fall in gas demand by 2050

  • Market: Electricity, Natural gas
  • 28/08/24

Greek gas demand will fall by nearly 70pc by 2050 as increasing renewable power installations displace gas in the power generation mix, according to Greece's revised National Climate and Energy Plan (NECP) put out for consultation last week.

Gas consumption falls to 44.1TWh in 2030 and then to 16.2TWh by 2050 from 51.2TWh in 2022, under projections in the NECP. This will be driven by renewables displacing gas in the power mix, the replacement of gas units for heating in residential and industrial contexts through electrification, and a rise in the production of biogas and biomethane.

Specifically for industry, the NECP assumes that gas demand will gradually decline to just 900GWh by 2050 from 6.6TWh in 2022, while in the commercial and public sector it will drop to 200GWh (see gas table). The NECP assumes a "dramatic increase in the electrification of building heating" through heat pumps, taking into account the ban on the sale of new oil and gas boilers from 2025, new EU laws on energy efficiency requirements in buildings, and the inclusion of building emissions in the EU emissions trading system.

The power sector accounts for the majority of Greek gas demand. The NECP assumes that gas-fired power generation will decline to 10.4TWh by 2030 and 4.8TWh by 2050, far below 19.1TWh in 2022. Gas is displaced by solar and wind, with renewables contributing 96pc of domestic power generation by the middle of the century (see power table). But the NECP still foresees installed gas-fired capacity remaining high later into the decade, reaching a peak installed capacity of 7.9GW in 2030 before falling back to 6.4GW in 2050, slightly above 6.3GW in 2022. The government expects Greece to become a net power exporter already in 2035, having been a net importer of 3.5TWh in 2022.

Gas-fired plants will remain "essential to ensure, in all cases, the stability and security of supply of the electricity system throughout the energy transition period", the NECP says. The plan foresees the need for a national compensation mechanism for gas-fired plants, particularly given the likely expansion of energy storage such as batteries further displacing gas from the power mix in 2030-40. Even some oil plants will potentially need to remain in cold reserve in case of emergency, mostly to ensure supply to some of the Greek islands.

And while the plan projects a nearly 70pc drop in gas demand by 2050, it still envisages the expansion of the national transmission system, mostly to facilitate Greece becoming "the main energy hub of the wider region". The plan lists seven main gas interconnector projects that are of "national, regional and international interest", including the doubling of the Trans-Adriatic pipeline's capacity to 10bn m³/yr, an expansion of the Interconnector Greece-Bulgaria's capacity to 5bn m³/yr, and the implementation of the Dioriga Gas LNG terminal, among others. If transmission system operator Desfa's expansion plans are fully carried out, transit capacity will increase to 8.5bn m³/yr by 2026 from 3.1bn m³/yr at present. However, these plans could be endangered "if the declared intention to fully decouple the EU from Russian gas is not implemented and if regional needs continue to be met mainly by Russian gas channelled through Turkey".

To avoid significant increases in Greek transmission tariffs, "only the absolutely necessary investments in the expansion of gas infrastructure" are promoted, according to the plan.

The NECP supports the development of small-scale LNG, enabled through the truck-loading services at Revithoussa and the under-construction bunkering jetty there. Small-scale LNG can displace oil in remote locations not connected to the gas grid, and is also important in decarbonising shipping and heavy land transport, the plan says.

Annual biomethane production rises to 2.1TWh by 2030 and 4.6TWh in 2050 from zero at present under the plan. About 80 biogas plants currently produce 1.4 TWh/yr of biogas, and 38 of these adjacent to gas networks could be converted "relatively quickly" to biomethane production of about 900 GWh/yr. The remaining 1.2 TWh/yr targeted by 2030 will come from new plants.

The NECP also aims to cut Greece's dependence on imports through the development of domestic gas production, if it proves to be commercially viable. Greece has awarded nine onshore and offshore exploration licences, and in April 2022 declared these projects to have national priority. In the past two years, "investigations have been accelerated" and drilling decisions are expected in the next two years. If final investment decisions are taken, new domestic production could come on line before the end of the decade. Preliminary estimates put potential and probable reserves in Greece at about 680bn m³, which if exploited would make Greece an exporter already by 2030, according to the NECP. More domestic production increases revenues for the Greek state, which can partly be used to implement the energy transition, the government said.

Projected annual power production by sourceTWh/yr
2022202520302035204020452050
Lignite5.84.5-----
Natural gas19.112.210.44.34.44.44.8
Oil5.11.90.40.30.2--
Biomass and biogas0.10.50.4----
Solar7.112.520.327.037.143.849.2
Onshore wind10.915.820.721.925.530.330.2
Offshore wind--0.614.721.730.643.6
Hydro3.95.86.47.47.78.69.1
Net imports3.53.21.8-3.7-6.7-11.1-6.6
Industrial and residential/commercial gas demandTWh/yr
20222030203520402050
Industrial gas demand6.64.94.61.40.9
Residential/commercial gas demand1.31.20.90.20.2

Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
20/12/24

US House votes to avert government shutdown

US House votes to avert government shutdown

Washington, 20 December (Argus) — The US House of Representatives voted overwhelmingly today to extend funding for US federal government agencies and avoid a partial government shutdown. The Republican-controlled House, by a 366-34 vote, approved a measure that would maintain funding for the government at current levels until 14 March, deliver $10bn in agricultural aid and provide $100bn in disaster relief. Its passage was in doubt until voting began in the House at 5pm ET, following a chaotic intervention two days earlier by president-elect Donald Trump and his allies, including Tesla chief executive Elon Musk. The Democratic-led Senate is expected to approve the measure, and President Joe Biden has promised to sign it. Trump and Musk on 18 December derailed a spending deal House speaker Mike Johnson (R-Louisiana) had negotiated with Democratic lawmakers in the House and the Senate. Trump lobbied for a more streamlined version that would have suspended the ceiling on federal debt until 30 January 2027. But that version of the bill failed in the House on Thursday, because of opposition from 38 Republicans who bucked the preference of their party leader. Trump and Musk opposed the bipartisan spending package, contending that it would fund Democratic priorities, such as rebuilding the collapsed Francis Scott Key Bridge in Baltimore, Maryland. But doing away with that bill killed many other initiatives that his party members have advanced, including a provision authorizing year-round 15pc ethanol gasoline (E15) sales. Depending on the timing of the Senate action and the presidential signature, funding for US government agencies could lapse briefly beginning on Saturday. Key US agencies tasked with energy sector regulatory oversight and permitting activities have indicated that a brief shutdown would not significantly interfere with their operations. But the episode previews potential legislative disarray when Republicans take full control of Congress on 3 January and Trump returns to the White House on 20 January. Extending government funding beyond 14 March is likely to feature as an element in the Republicans' attempts to extend corporate tax cuts set to expire at the end of 2025, which is a key priority for Trump. The Republicans will have a 53-47 majority in the Senate next month, but their hold on the House will be even narrower than this year, at 219-215 initially. Trump has picked two House Republican members to serve in his administration, so the House Republican majority could briefly drop to 217-215 just as funding for the government would expire in mid-March. Congress will separately have to tackle the issue of raising the debt limit. Conservative advocacy group Economic Policy Innovation Center projects that US borrowing could reach that limit as early as June. By Haik Gugarats Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Find out more
News

Brazil Bndes invests more in Sao Paulo EV fleet


20/12/24
News
20/12/24

Brazil Bndes invests more in Sao Paulo EV fleet

Sao Paulo, 20 December (Argus) — Brazil's Bndes development bank approved R94.8mn ($15.6mn) in financing for transport company MobiBrasil to buy 87 electric buses in Sao Paulo city. The environment ministry's climate fund — created to finance climate change mitigation projects and Bndes — will be responsible for R45mn. A federal fund to provide financial security to the unemployed, dubbed FGTS, will be responsible for the remaining R49.8mn. This is Bndes' first operation using FGTS resources. Earlier this month, Bndes said it will invest R2.5bn to buy 1,300 EV-buses in Sao Paulo city . On 9 December, the city's council postponed the bus fleet transition from diesel-powered to EVs to 2054 from the previous 2038 deadline. By Maria Frazatto Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

US government agencies set to shut down


20/12/24
News
20/12/24

US government agencies set to shut down

Washington, 20 December (Argus) — US federal agencies would have to furlough millions of workers and curtail permitting and regulatory services if no agreement is reached by Friday at 11:59pm ET to extend funding for the government. US president-elect Donald Trump and his allies — including Tesla chief executive Elon Musk — on 18 December upended a spending deal US House of Representatives speaker Mike Johnson (R-Louisiana) had negotiated with Democratic lawmakers in the House and the Senate. Trump endorsed an alternative proposal that Johnson put together, but that measure failed in a 174-235 vote late on Thursday, with 38 Republicans and nearly every Democrat voting against it. Trump via social media today indicated he would not push for a new funding bill. "If there is going to be a shutdown of government, let it begin now, under the Biden Administration, not after January 20th, under 'TRUMP,'" he wrote. There was little to indicate as of Friday morning that Trump, Republican congressional leadership and lawmakers were negotiating in earnest to avert a shutdown. The House Republican conference is due to meet in the afternoon to weigh its next steps. President Joe Biden said he would support the first funding deal that Johnson negotiated with the Democratic lawmakers. "Republicans are doing the bidding of their billionaire benefactors at the expense of hardworking Americans," the White House said. Any agreement on funding the government will have to secure the approval of the House Republican leadership and all factions of the Republican majority in the House, who appear to be looking for cues from Trump and Musk on how to proceed. Any deal would then require the support of at least 60 House Democrats to clear the procedural barriers, before it reaches the Senate where the Democrats hold a majority. The same factors will be in play even if the shutdown extends into early 2025. The Republicans are set to take the majority in the Senate when new Congress meets on 3 January. But their House majority will be even slimmer, at 219-215, requiring cooperation of Democratic lawmakers and the Biden administration. What happens when the government shuts down? Some agencies are able to continue operations in the event of a funding lapse. Air travel is unlikely to face immediate interruptions because key federal workers are considered "essential," but some work on permits, agricultural and import data, and regulations could be curtailed. The US Federal Energy Regulatory Commission has funding to get through a "short-term" shutdown but could be affected by a longer shutdown, chairman Willie Phillips said. The US Department of Energy, which includes the Energy Information Administration and its critical energy data provision services, expects "no disruptions" if funding lapses for 1-5 days, according to its shutdown plan. The US Environmental Protection Agency would furlough about 90pc of its nearly 17,000 staff in the event of a shutdown, according to a plan it updated earlier this year. The Interior Department's shutdown contingency plan calls for the Bureau of Land Management (BLM) to furlough 4,900 out of its nearly 10,000 employees. BLM, which is responsible for permitting oil, gas and coal activities on the US federal land, would cease nearly all functions other than law enforcement and emergency response. Interior's Bureau of Safety and Environmental Enforcement, which oversees offshore leases, would continue permitting activities but would furlough 60pc of its staff after its funding lapses. The US Bureau of Ocean Energy Management will keep processing some oil and gas exploration plans with an on-call group of 40 exempted personnel, such as time-sensitive actions related to ongoing work. The shutdown also affects multiple other regulatory and permitting functions across other government agencies, including the Departments of Agriculture, Transportation and Treasury. By Haik Gugarats Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Investment funds cut net long positions on Ice TTF


20/12/24
News
20/12/24

Investment funds cut net long positions on Ice TTF

London, 20 December (Argus) — Investment funds have cut their TTF gas net long positions on the Intercontinental Exchange (Ice) by nearly 50TWh from their historic peak at the end of November, while commercial undertakings' positions have moved strongly in the opposite direction. Investment funds' net long position had climbed steadily from 202TWh in the week ending 18 October to an all-time high of nearly 294TWh by 29 November. But in the two weeks since that point, their net position has dropped again by 48TWh ( see graph ), leaving their 246TWh net long position at the smallest since 8 November, according to Ice's latest commitments of traders report. However, only around 30pc of the decrease in the net long position came from closing long positions, with the large majority coming from opening up more shorts. Total long contracts were cut to 445TWh on 13 December from 461TWh on 29 November, but short contracts jumped to 200TWh from 167TWh in the same period. Such a large trimming of the net long position contributed to falling prices over the period — the benchmark Argus TTF front-month price fell from €48.45/MWh at the start of the month to €41.10/MWh at the close on 13 December. The front-quarter, front-season and front-year contracts all fell by roughly the same amount, as the entire price curve shifted down. While investment funds reduced their net long position over these two weeks, commercial undertakings — predominantly utilities — moved in the opposite direction, with their net short position falling to 37TWh from 102TWh. This was driven entirely by opening up more long contracts, which jumped to 947TWh from 877TWh, while shorts increased by just 5TWh between 29 November and 13 December to 984TWh. Commercial undertakings' total open interest therefore soared to 1.93PWh by the end of last week, triple the volume of investment funds' total open interest. Investment funds have in the past two weeks bought "risk reduction" contracts — generally used for hedging purposes — for the first time since May 2021. This suggests that some investment funds hold physical positions that they want to hedge their exposure to, although the volumes are small at around 300GWh for both shorts and longs. While utilities' positions in the futures markets are mostly risk-reducing to offset the risk held in physical positions, investment funds' positions are typically not risk-reducing because they are bets on the direction of prices. That said, utilities and other commercial undertakings such as large industrial buyers have increasingly set up trading desks that compete with hedge funds to capitalise on price trends and volatility in recent years. Risk reduction contracts account for around 69pc of commercial undertakings' open interest, meaning the other 31pc of contracts — amounting to 600TWh — were more speculative in nature. This 600TWh of speculative total open interest is only just below the 645TWh held by investment funds. By Brendan A'Hearn ICE TTF net positions TWh Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Australia’s Cleanaway, LMS to produce landfill gas


20/12/24
News
20/12/24

Australia’s Cleanaway, LMS to produce landfill gas

Sydney, 20 December (Argus) — Australian waste management operator Cleanaway and bioenergy firm LMS Energy will partner on a 22MW landfill gas-fired power station at Cleanaway's Lucas Heights facility near the city of Sydney. Cleanaway, Australia's largest publicly listed waste management firm, will receive exclusive rights to landfill gas produced at Lucas Heights for 20 years, the company said on 20 December. LMS will invest A$46mn ($29mn) in new bioelectricity assets, including a 22MW generator. Tightening gas markets owing to underinvestment in new supply has led to speculation that more waste-to-energy plants could be brought on line in coming years, especially in the southern regions. Landfill gas projects receive Australian Carbon Credit Units (ACCUs) by avoiding methane releases, with the total ACCU quantity calculated after a default baseline of 30pc is deducted for projects beginning after 2015. A total of 42.6mn ACCUs were issued to landfill gas projects since the start of the ACCU scheme in 2011, 27pc of the total 155.7mn and the second-largest volume after human-induced regeneration (HIR) methods at 46.68mn. Canberra is reviewing ACCU issuance for these projects, and wants most projects to directly measure methane levels in captured landfill gas to avoid overestimation. Landfill gas operations which generate electricity from the captured gases can also receive large-scale generation certificates (LGCs). LMS has 70 projects currently registered at the Clean Energy Regulator (CER) and has received 24.57mn ACCUs since the start of the scheme. This is the largest volume for any single project proponent, just ahead of Australian environmental market investor GreenCollar's subsidiary Terra Carbon with 23.57mn units. Cleanaway received almost 1mn ACCUs from two projects and has four other projects that have yet to earn ACCUs. By Tom Major and Juan Weik Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Generic Hero Banner

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more