Generic Hero BannerGeneric Hero Banner
Latest market news

Chinese 2Q coking coal contracts settle higher

  • Market: Coking coal
  • 30/03/20

Chinese state-owned producer Shanxi Coking Coal has raised second-quarter contract prices for some of its highest quality coking coal grades while keeping unchanged or lowering prices for other brands.

Prices for its highest quality, low-sulphur brand rose by 20 yuan/t ($2.80/t) for April-June sales, while prices for its other low-sulphur coking coal grades are expected to remain unchanged.

Prices for mid-sulphur grade coking coal fell by Yn30/t and for high-sulphur grades fell by Yn50/t.

The result was largely in line with market expectations that prices across most main coking coal grades should drop by Yn30-50/t with the restart of mines now that that coronavirus outbreak is under control in China.

But low-sulphur coal prices have little room to drop because supplies remain tight even with the restart of mining operations, market participants said. Even before the coronavirus outbreak, supplies of low-sulphur coking coal in China have been continuously limited by a spate of workplace accidents in Chinese mines that tightened safety checks and resulted in production curbs.

Shanxi Coking Coal contract prices are more a market sentiment indicator than reflective of any actual demand-supply balance in the spot market, participants said. This is because these contracts are usually signed between Shanxi Coking Coal and large state-owned steel producers, a Singapore-based trader said. Private-sector mills that are most exposed to spot prices do not enjoy the privilege of being able to lock in prices in term contracts.

"This is a rather strong indicator that support for coking coal prices will remain despite the relatively smooth work resumption that we have seen in mining over the past one month," a Beijing-based trader said.

Mongolia, China's largest source of imports last year, has twice delayed restarting shipments to China since it halted them in early February. The next rescheduled border reopening could be on 1 April.

The strength in China's domestic market is in contrast to falling seaborne coking coal prices, now that China is the only market left with any ability to take spot cargoes. Other regions like India and Europe continue to be plagued by lockdowns amid the coronavirus outbreak.

The Argus premium low-volatile hard coking coal cfr China index last week fell by $7.85/t to $162.55/t.

A cargo of May-loading Peak Downs traded late last week at $159/t cfr China, with a seller's option for Saraji at $158/t cfr. A similar cargo last traded just a week ago at $173.80/t cfr China.


Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
28/07/25

Australia’s Bowen Coking Coal cuts output in FY2024-25

Australia’s Bowen Coking Coal cuts output in FY2024-25

Sydney, 28 July (Argus) — Australian producer Bowen Coking Coal (BCC) posted lower coal sales and production in the July 2024 to June 2025 financial year, despite operating at the upper end of its guidance range. The company produced 1.8mn t of saleable coal in 2024-25, down by 7.8pc from 1.9mn t in 2023-24, it announced in its latest quarterly report on 28 July. But its throughput increased. The company mined 2.9mn t of run-of-mine (ROM) coal in 2024-25, up by 2.3pc on the year, and on the upper end of its 2.7mn-3mn t guidance. BCC hit the lower end of its ROM guidance range at the end of May . BCC sold 1.8mn t of coal over the year, down by 7.5pc on the year, although the amount was at the upper end of its 1.6mn–1.9mn t guidance range. The company sold a mix of thermal coal, coking coal, and PCI coal, as in previous years. Coking coal and PCI accounted for 71.1pc of its sales in 2024-25, down from 74.4pc in 2023-24. The company will cut production at its flagship 5.5mn t/yr Burton mine complex in July-September, because of severe cash availability challenges. It expects to produce 500,000t of ROM coal over the quarter, down from 769,000t over the same period in 2024. Mining services firm BUMA has made financial claims totalling A$29.4mn ($19mn), but BCC cannot pay this while meeting its other payment obligations, BCC said on 28 July. It also needs to pay A$2.7mn in mineral royalties to the Queensland Revenue Office at the end of July. The company's cash reserves are falling relatively quickly. BCC had A$37.7mn of reserves — including A$19.4mn in restricted cash — on 28 July, down from A$45mn on 14 July . BCC has been suspended from quotation on the Australian Stock Exchange (ASX) since 15 July, pending a financing announcement. By Avinash Govind Bowen Coking Coal (quarterly report) mn t Apr-Jun '25 Apr-Jun '24 y-o-y Change (%) Jul '24 - Jun '25 Jul '23 - Jun '24 FY Change (%) ROM Coal 0.8 0.8 -8.3 2.9 2.9 2.3 Saleable Coal 0.4 0.5 -6.4 1.8 1.9 -7.8 Coal Sales (Produced) 0.4 0.4 -0.2 1.8 2 -7.5 Source: Bowen Coking Coal Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

Find out more
News

Groups challenge US mining regulator nominee


21/07/25
News
21/07/25

Groups challenge US mining regulator nominee

New York, 21 July (Argus) — Environmental and consumer advocacy groups are challenging President Donald Trump's nominee to head the US Office of Surface Mining, Reclamation and Enforcement (OSMRE). In two letters sent to members of the Senate Energy and Natural Resources committee, groups urged the senators to reject Lanny Erdos' (R) nomination. They claim Erdos' history as a coal industry executive and as an OSMRE official during Trump's first presidential term could result in weaker regulations. The Senate committee had been expected to vote on Erdos' nomination last week but postponed the session. Twelve environmental and consumer advocacy organizations submitted a letter to the Senate committee shortly before last week's scheduled vote and resubmitted the letter on Monday with 13 additional groups signing on in protest of Erdos' nomination. Erdos had led OSMRE in the final 17 months of Trump's previous administration. He held positions in state regulatory agencies before that and has been vice president for environmental compliance for coal producer Eagle Summit Resources' subsidiary Cardinal Reclamation since February 2021. "My nearly 35 years of experience in public service at the Department of the Interior and the Ohio Department of Natural Resources has prepared me well for the position," Erdos said in prepared testimony before a Senate Energy and Natural Resources Committee hearing on 9 July. "Additionally, my recent time spent in the private sector as an environmental and reclamation manager has given me a unique 360-degree perspective of the challenges facing the coal industry." But the environmental groups argue that Erdos weakened regulations that protect the environment and coal communities when he was previously at OSMRE. This included overseeing changes to the 10-day Notices and Corrective Action rule, a protocol that requires state regulators respond to federal notices of potential coal mine violations within 10 days under the Surface Mining Control and Reclamation Act of 1977. Those changes, which critics say made it harder for communities to compel coal mines to fix violations, were repealed in April 2024 but OSMRE last month proposed reinstating them . "He's also, since leaving the first Trump administration, served as a coal mine executive himself, and that's an unacceptable conflict of interest," said Cameron Walkup, Earthjustice legislative assistant. "This would be like putting a fox in charge of a hen house." By Elena Vasilyeva Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

News

Workers extend strike at Australian coal mine


11/07/25
News
11/07/25

Workers extend strike at Australian coal mine

Sydney, 11 July (Argus) — Unionised workers have extended a strike at US producer Peabody Energy's Metropolitan coal mine in New South Wales, Australia, halting production until 17:30 AEST (07:30 GMT) on 11 July. Workers launched the day-long stoppage late on 10 July, extending the previous 24-hour strike , the Mining and Energy Union (MEU) told Argus on 11 July. Metropolitan has faced significant labour disruptions since 18 June, when Peabody locked workers out of the mixed thermal, hard coking and pulverised coal injection (PCI) mine, without pay, over an ongoing employment dispute. The company's lock-out ended late on 9 July. The MEU and Peabody are negotiating a new enterprise agreement, but remain at odds over multiple issues, including the use of contractors. Both have engaged in Fair Work Commission-led mediation three times — most recently on 8 July — since the dispute began, but have no further meetings scheduled. Metropolitan Coal remains fully committed to ongoing good faith negotiations with the union, a Peabody spokesperson told Argus on 10 July. By Avinash Govind Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

News

Workers strike at Australian coal mine: Correction


10/07/25
News
10/07/25

Workers strike at Australian coal mine: Correction

Corrects mine lock-out start date in paragraph 3 Sydney, 10 July (Argus) — Mining and Energy Union (MEU) workers at US producer Peabody Energy's Metropolitan mine in New South Wales are striking over an ongoing pay dispute, halting production until 5pm AEST (7am GMT) on 10 July. MEU launched a five-hour stoppage at 5pm on 9 July, before extending it to 12 hours. The unionised workers launched another 12-hour strike early on 10 July, the union told Argus on the same day. Peabody locked miners out of the mixed thermal, hard coking, and pulverised coal injection (PCI) mine from 18 June until 5:30pm on 9 July, without pay, over an increasingly acrimonious employment negotiation. MEU and Peabody negotiators are at odds over the use of contractors at Metropolitan, among other issues. They met for Fair Work Commission-led mediation during the lock-out on 8 July. Metropolitan Coal remains fully committed to ongoing good faith negotiations with the union, a Peabody spokesperson told Argus on 10 July. The MEU's latest strike comes a day after unionised workers at global producer Glencore's 20mn t/yr Ulan thermal coal mine launched a day-long strike, targeting some underground operations at the complex. The Ulan strike is set to end on 10 July. By Avinash Govind Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

News

US' Peabody extends coal mine lock-out: Correction


10/07/25
News
10/07/25

US' Peabody extends coal mine lock-out: Correction

Corrects mine lock-out start date in paragraph 3 Sydney, 10 July (Argus) — US coal producer Peabody Energy has extended a lock-out of workers at its Australian Metropolitan mine until late on 9 July, because of a continuing dispute with the Mining and Energy Union (MEU). MEU workers will remain barred from entering the mixed thermal, pulverised coal injection (PCI), and hard coking coal mine — which produced 1.8mn t of coal in 2024 — without pay until 9 July, the union and company confirmed on 7 July. Peabody's lock-out began on 18 June and was scheduled to end on 6 July . The company ended the action early on 3 July, but then reintroduced and extended it late on 4 July because of partial work bans. The MEU can launch an unlimited number of work stoppages and limited work bans at Metropolitan, based on a 7 June strike authorisation. The MEU and Peabody remain at odds over the use of contractors at the mine, among other issues. The two groups are scheduled to engage in a Fair Work Commission (FWC) mediation on 8 July. They have already had two FWC mediations over the dispute, said Peabody's vice-president of underground operations Mike Carter on 7 July. Peabody has also met with employees more than 10 times, he added. Metropolitan Coal remains fully committed to ongoing good faith negotiations with its workers, a Peabody spokesperson said on 7 July. MEU workers will rally outside the site early on 8 July, joined by other labour unions. The labour dispute at Metropolitan follows a series of strikes at Peabody Energy's 12mn t/yr Wilpinjong thermal coal mine in February, over a different contract negotiation. By Avinash Govind Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

Generic Hero Banner

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more