Generic Hero BannerGeneric Hero Banner
Latest market news

Steel decarbonisation gathers speed

  • Market: Hydrogen, Metals
  • 07/02/22

The announcement within the last week of over 6mn t/yr of new direct-reduced iron (DRI) capacity and five new electric arc furnace (EAF) sites by the early 2030s suggests that conditions are becoming increasingly favourable for low-carbon steelmaking.

German steelmaker Salzgitter will fully move to hydrogen and renewable energy-based DRI-EAF steelmaking by 2033. It will award construction projects for industrial facilities by the end of this year.

ArcelorMittal announced further DRI and EAF capacity in France, including 2.5mn t/yr of DRI-EAF capacity at Dunkirk and an EAF unit at Fos-sur-mer to be fed by scrap, requiring a total investment of €1.7bn ($1.94bn). This brings the steelmaker's total DRI capacity plans for 2030 to roughly 10.8mn t/yr, including projects in Spain, Belgium, Germany and France.

Swedish steelmaker SSAB announced last week that it would do the same, bringing forward plans for almost 3mn t/y of EAF capacity at Lulea, Sweden, and Raahe, Finland, to 2030 from 2030-45.

ETS phase-out incentivises decarbonisation

The timing of steelmakers' decarbonisation plans suggests that EU policy on carbon costs is having the desired push effect towards greener steelmaking. While so far only pilot-scale hydrogen-based steel projects are operational, several industrial-scale projects are planned to come on line around 2026, when the ETS-CBAM transition begins, and over 30mn t is planned by 2033, after the phase-out is to be completed in 2030.

The phase-out of free allowances under the EU emissions trading system (ETS) and the introduction of a carbon border adjustment mechanism (CBAM) over 2026-30 in theory provides protection for low-carbon steelmaking in the EU, while removing the incentive for steelmakers to cut costs by continuing to use coal or gas as an energy source. And the threat of paying over €80/t in carbon costs is an important incentive for EU steelmakers to decarbonise. But European steel association Eurofer argues that the EU should continue to grant free emissions throughout the whole ETS-CBAM transition phase to mitigate the carbon costs that steelmakers will bear, alongside the considerable investment costs of reducing emissions by 30pc by 2030, estimated by Eurofer to be around €25bn. "The combined effect of the huge investment needed to decarbonise — and also [of] simply cutting emissions by cutting production, which is inevitable given the existing technology, plus skyrocketing energy prices and rising production costs will put enormous and unsustainable pressure on our members," Eurofer director of market analysis Alessandro Sciamarelli said. Eurofer estimates the cost to the industry in 2030 will be €14bn at today's emissions levels or €8.4bn presuming a 30pc emissions reduction.

Cross-sectoral relationships pivotal

The EU plans to have 6GW of renewable hydrogen electrolyser capacity by 2024, and 40GW by 2030, as well as 40GW of production available for import from outside the EU by 2030. But partnership with companies in upstream and downstream sectors have been determining factors for steelmakers assessing the viability of hydrogen-based DRI-EAF steelmaking.

Salzgitter and Danish energy provider Orsted aim to establish a circular supply chain, within which Salzgitter will supply renewably-produced steel, largely for use in the construction of wind farms, and Orsted will supply renewable (wind-generated) energy, as well as returning windmill parts to Salzgitter as low-CO2 scrap at the end of their life span. The company aims to increase the amount of scrap it uses by 50pc to 3mn t/yr by 2033. Salzgitter will also supply low-CO2 steel to all of carmaker BMW's European plants from 2026 onwards.

ArcelorMittal recently added to its investments in the renewable energy sector, committing $100mn to sustainable energy-focused investment fund Breakthrough Energy, and $5mn to Israel's H2Pro, a company that has developed E-TAC (Electrochemical — Thermally Activated Chemical) technology that splits water into hydrogen and oxygen in a process similar to electrolysis.

For SSAB, the abundance of hydroelectric and wind power in northern Sweden has played an important part in allowing the steelmaker to fully commit renewable-powered EAF production within the next eight years, as has its partnership with iron ore mining firm LKAB and energy provider Vattenfall.

Further progress by steelmakers in forming supply or offtake partnerships might encourage further decarbonisation commitments in the near future. German steelmaker Dillinger-SHS has an initial agreementwith engineering company Paul Wurth and steelmaker Liberty to develop a 2mn t/yr DRI plant including 1GW of hydrogen electrolysis capacity at Dunkirk. The steelmaker is also working with seven energy and engineering companies to develop a "hydrogen economy" in the German Saar region, the French Lorraine region, and the state of Luxembourg by producing 61,000 t/yr of hydrogen and investing €600mn in production facilities and transport infrastructure.

Green steel projects

Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
12/05/25

Russia urges decision on Bolivia Li deal

Russia urges decision on Bolivia Li deal

Sao Paulo, 12 May (Argus) — The Russian ambassador to Bolivia today criticized what he described as Bolivian government stalling of a $970mn lithium concession deal with Russian-backed Uranium One Group. Dmitry Verchenko, in an interview with Bolivian state outlet Agencia Boliviana de Información, said the Bolivian congress is taking an "excessive" amount of time to reach a decision on the $970mn lithium concession deal signed in September 2024. The concession deal included the production of 14,000 metric tonnes (t)/yr of lithium carbonate equivalent (LCE) from the Uyuni salt flat — the largest lithium reserve in the world at 23mn t. Verchenko said that Uranium One, a subsidiary of state-owned atomic energy agency Rosatom, will build a pilot plant capable of producing 1,000t/yr LCE as soon as possible and follow up with gradual expansions. The project — which is still unnamed — will be the country's first direct lithium extraction (DLE) plant, a brine processing method that reduces LCE production time and water usage. Bolivian energy minister Alejandro Gallardo last month urged congress to approve both Russia's and China's CBC concession deals , but still no progress has been made. Congress in February said that it would only discuss the two deals after a nationwide round of public consultations that remains unscheduled. Political uncertainty delays Bolivia's Li hopes There is no forecast of when or if the concessions may be approved because Bolivia's congress is deeply divided between allies and political opponents of Luis Arce, the current president. Neither faction has the required majority for the bills to pass. The country will hold a presidential election in August and market participants expect a congressional vote on the matter may be pushed to next year because of uncertainty in the current polling ahead of the election. Russia looks further afield Verchenko added that Russian and Uranium One are waiting on the approval of the concession deal despite neighboring Argentina and Chile rapidly developing their lithium markets. Given the delay, Russia is already looking for alternative lithium solutions in Latin America with Brazil emerging as a potential partner . Following an in-person meeting with Russian president Vladimir Putin on 10 May, Brazilian president Luiz Inácio Lula da Silva confirmed that Brazil is actively seeking to collaborate with Russia to extract spodumene from the country's so-called Lithium Valley, a lithium-rich region located in the state of Minas Gerais. Bolivia's 2024 lithium carbonate output stood at 1,832t . By Pedro Consoli Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

Find out more
News

Tata UK lambasts importers' TRA submissions


12/05/25
News
12/05/25

Tata UK lambasts importers' TRA submissions

London, 12 May (Argus) — Claims by the International Steel Trade Association and importers in the Trade Remedies Authority's (TRA) safeguard review are "factually incorrect", Tata Steel UK has said Importers have stated — accurately — that Tata does not produce 2m-wide hot-rolled coil, or material with a tensile strength of over 500 megapascal, so these products should not be under the scope of the safeguard. In a rebuttal submission released by the TRA today, Tata said such specifications "constitute a small proportion of the overall market", and that current quotas are more than sufficient to provide import choice. Should these grades be excluded from the safeguard, Tata — which is effectively a re-roller until its electric arc furnace becomes operational — said importers could circumvent the safeguard, importing higher grades "at much lower prices" to compete with material produced and sold by Tata. Tata said wider coil is "often imported only to be slit into narrower cuts", meaning it is not fundamentally different from material it sells domestically. Some applications do require decoiled 2m-wide material, but Tata suggests this is a small proportion of the overall market. No end-users have raised concerns regarding supply of such material, Tata said, adding that sufficient tonnes could be imported from the EU or Turkey, origins with quotas that are "consistently underutilised quarter after quarter". Buyers just want such products to be excluded so they can "access significantly lower-priced imports", it said. Tata has requested quotas be amended in line with the demand reduction seen in recent years, and that caps are implemented on other countries' quota for hot-dip galvanised. Should a cap of 25pc be imposed, which is what the market anticipates, some traders said material currently on route to the UK could still be clearing in January 2026. The TRA is expected to release its initial findings this week. By Colin Richardson Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

News

Ford pauses production at Chicago plant


09/05/25
News
09/05/25

Ford pauses production at Chicago plant

Houston, 9 May (Argus) — Automaker Ford temporarily shut down production at its Chicago, Illinois, assembly plant following a supply chain disruption. The company said it moved a planned downtime week ahead of schedule and expects to resume production by 19 May. Congressman Frank Mrvan (D-Indiana) in a US House appropriations hearing on 7 May said the shutdown was due to a shortage of critical minerals needed to produce the company's braking systems. The company did not respond to the specific elements driving the shutdown. The plant manufactures the Ford Explorer, Police Interceptor Utility and Lincoln Aviator. By Jenna Baer Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

News

Brazil's CSN expects flat steel, upside ahead


09/05/25
News
09/05/25

Brazil's CSN expects flat steel, upside ahead

Sao Paulo, 9 May (Argus) — Brazil's mining and steel firm CSN expects strong domestic demand to keep steel prices flat in 2025, with the potential for an uptrend in the coming months. Sales to the agricultural machinery and automotive industries should continue to trend upward , the company said. Civil construction sales have been solid and could tick up as the rainy season ends in Brazil. "Demand is good," executive director Luis Fernando Martinez said, adding that the firm will hold back price gains "to maintain profitability." The price of CSN's overall steel products increased by 5pc in the first quarter from a year earlier thanks to a 7pc increase in demand. Average steel prices hit a two-year high at R5,252 ($928)/metric tonne from R5,008/t a year earlier. Steel consumption has been climbing in Brazil and sales could have been stronger if not for growing competition from imports, the company said. Brazil's import penetration hit 27pc of the domestic market in the quarter, outstripping CSN's domestic market share. "I've never seen this in the [23 years] I've been in the company," Martinez said, calling the situation "unsustainable." Despite what he described as an inefficient tariff policy against imports, prices are expected to remain at current levels. Brazil implemented a 25pc tariff on 11 steel products from China in June 2024. The policy is set to expire by the end of May. Results Shipments reached 1.14mn t in the period, up 5pc from 1.08mn t a year earlier, driven by 8pc growth in domestic market sales. Slab production fell by 16pc to 812,000t because of a stoppage at the Rio de Janeiro-based Blast Furnace 2 in January. The company expects the asset to remain under maintenance for at least three more months. CSN produced 775,000t of flat-rolled steel in the quarter, 11pc less than a year prior. Long steel output increased by 12pc to 58,000t from a year earlier. The company registered a R732mn loss in the first quarter, 53pc higher than the R480mn loss a year before. By Isabel Filgueiras Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

News

Brazil's inflation accelerates to 5.53pc in April


09/05/25
News
09/05/25

Brazil's inflation accelerates to 5.53pc in April

Sao Paulo, 9 May (Argus) — Brazil's annualized inflation rate rose to 5.53pc in April, accelerating for a third month despite six central bank rate hikes since September aimed at cooling the economy. The country's annualized inflation accelerated from 5.48pc in March and 5.06pc in February, according to government statistics agency IBGE. Food and beverages rose by an annual 7.81pc, up from 7.68pc in March. Ground coffee increased at an annual 80.2pc, accelerating from 77.78pc in the month prior. Still, soybean oil prices decelerated to 22.83pc in April from 24.36pc in March. Domestic power consumption costs rose to 0.71pc from 0.33pc a month earlier. Transportation costs decelerated to 5.49pc from 6.05pc in March. Gasoline prices slowed to a 8.86pc gain from 10.89pc a month earlier. The increase in ethanol and diesel prices decelerated as well to 13.9pc and 6.42pc in April from 20.08pc and 8.13pc in March, respectively. The hike in compressed natural gas prices (CNG) fell to 3.5pc from 3.92pc a month prior. Inflation posted the seventh consecutive monthly increase above the central bank's goal of 3pc, with tolerance of 1.5 percentage point above or below. Brazil's central bank increased its target interest rate for the sixth time in a row to 14.75pc on 7 May. The bank has been trying to counter soaring inflation as it has recently changed the way it tracks its goal. Monthly cooldown But Brazil's monthly inflation decelerated to 0.43pc in April from a 0.56pc gain in March. Food and beverages decelerated on a monthly basis to 0.82pc in April from a 1.17pc increase a month earlier, according to IBGE. Housing costs also decelerated to 0.24pc from 0.14pc in March. Transportation costs contracted by 0.38pc and posted the largest monthly contraction in April. Diesel prices posted the largest contraction at 1.27pc in April. Petrobras made three diesel price readjustments in April-May. By Maria Frazatto Send comments and request more information at feedback@argusmedia.com Copyright © 2025. Argus Media group . All rights reserved.

Generic Hero Banner

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more