Latest market news

S Korea unveils strategy to promote circular economy

  • Market: Battery materials, Metals, Petrochemicals
  • 22/06/23

South Korea unveiled a strategy on 21 June to promote a circular economy across nine major industries, aimed at reducing carbon emissions and stabilising the domestic supply chain of key resources.

The relevant industries include petrochemicals, steel, non-ferrous metals, batteries, electronics, textiles, automobiles, machinery and cement.

South Korea's circular economy strategy will focus on recycling resources in the nine industries to promote and achieve sustainable growth, according to the Ministry of Trade, Industry and Energy (Motie). It will initiate its circular economy strategy by creating nine leading projects within these industries, called the circular economy (CE) 9 project.

"The key is to use fewer resources to produce products, use them for a long time and recycle resources after use," said Motie.

Motie will organise and operate a consultative body involving related ministries to review ways that by-products of production processes can be used. The government will also support the setting up of domestic and foreign renewable raw material supply chains. Motie will also advance a national integrated resource management system, create a resource efficiency rating system and a renewable raw material certification system, as well as identify companies that embody circular economy practices to lay the foundation to promote such projects.

Project aims

The first two projects involve the petrochemical industry, with the first aiming to expand pyrolysis oil production. The country hopes to accomplish this by revising laws and regulations that are necessary to promote pyrolytic oil projects, such as the Petroleum and Alternative Fuel Business Act. South Korea also aims to expand infrastructure to secure plastic waste resources.

The second project involves developing technologies such as waste plastic depolymerisation and plasma pyrolysis. It will also provide consulting and facility support for companies looking to convert to the recycling business.

The third and fourth projects are in the steel and non-ferrous metal sectors, with the third project seeking to maximise the use of iron scrap. It will achieve this by recognising steel scrap as a recyclable resource, advancing technology involved in the scrap recycling process and securing overseas scrap.

The fourth project is focused on the recycling of rare metals. Supply and demand patterns of 28 rare metals will be identified by analysing their supply chains. The project will also develop technology for purifying and extracting environmentally-friendly, high-purity rare metals, as well as set up a demonstration facility. This is in line with an earlier plan South Korea released in February to stabilise domestic supply of key metals.

The fifth project will create a foundation for reuse and recycling in the battery sector. A reusable battery safety inspection system and electric vehicle battery history management system will be implemented under this project. The sixth project will promote the production and use of recycled raw materials in the battery sector, by developing technology used to recover lithium and nickel — among other battery materials — from used batteries.

The seventh project will expand eco-design in the electronics and textile industries.

The eighth project is aimed at boosting exports of remanufactured products in the auto and machine industry. This will be done by remanufacturing ageing construction and industrial machinery to be exported to southeast Asia and central Asia. Direct exports or local production of the products will be supported by intergovernmental co-operation projects.

The last and ninth project is geared towards securing alternative fuel and raw materials in cement production.

The circular economy is "attracting attention as a future growth engine," Motie said, with the ministry citing consultancy Accenture's expectations that the market size will increase to $4.5 trillion by 2030.


Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
26/07/24

Technical issues shut Japanese crackers, delay restarts

Technical issues shut Japanese crackers, delay restarts

Singapore, 26 July (Argus) — A series of technical issues forced Japanese cracker operators to shut their units or delay restarts in July, resulting in lower olefins output and higher spot demand. Idemitsu Kosan shut its naphtha cracker in Tokuyama, Yamaguchi prefecture on 15 July, because of gas leakage at its complex. The cracker can produce up to 623,000 t/yr ethylene and 370,000 t/yr propylene. Associated downstream units at the Tokuyama site are likely still operating, resulting in spot demand for prompt ethylene cargoes in the Japanese market, according to market participants. The restart date of the cracker remains unclear, with some market sources saying that the cracker could be on line again in first-half of August. But others said the cracker will be off line until end of August to coincide with Idemitsu Kosan's planned maintenance schedule. Idemitsu Kosan originally planned to shut the Tokuyama-based cracker in September for a 50-day turnaround. The firm declined to comment on the turnaround schedule, citing that the cracker remains shut and it is unsure when it can resume operations. Mitsui's cracker in Sakai, Osaka prefecture also encountered technical issues during its cracker restart. The producer has completed the turnaround, which took place in early July, but will need to procure equipment to address technical issues for the cracker start-up, market participants said. Mitsui's cracker has a nameplate capacity of 600,000 t/yr of ethylene and 280,000 t/yr of propylene. Fellow producer Maruzen Petrochemical also delayed the restart of its cracker in the Chiba prefecture. The cracker was shut on 15 May and was supposed to restart by mid-July. The shutdown has been extended to the end ofJuly, according to market participants. The reason behind the extensions were unclear. Maruzen's Chiba cracker has a production capacity of 525,000 t/yr of ethylene and 335,000 t/yr of propylene. Tighter supplies Shutdown extensions and sudden outages at crackers have tightened olefins supplies in northeast Asia, with Chinese market participants reporting limited offers this week. Asian ethylene prices in the cfr northeast Asia market rose slightly this week to $860-880/t, up by $8/t from the last session, according to Argus ' latest assessments on 24 July. Japan experienced a heavy cracker turnaround season this year, with four crackers conducting scheduled maintenance in the first-half of 2024. Eneos' cracker in Kawasaki prefecture was shut from 5 March until mid-May. Tosoh's Yokkaichi cracker in Mie prefecture was also shut for maintenance from 4 March to the end of April. Keiyo Ethylene's cracker in Chiba prefecture went off line on 10 April for a 14-day planned maintenance. Mitsubishi Chemical's cracker in Kashima, Ibaraki prefecture was shut from May to June. Total ethylene exports from Japan this year are expected to fall from the previous year because of heavy cracker turnarounds. Japan's ethylene exports were at 239,642t during January-May, down by 5,733t from the same period in 2023, according to GTT data. Imports were at 20,296t from January to May, up by 13,500t or almost tripling on the year. By Nanami Oki, Brian Leonal and Toong Shien Lee Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Find out more
News

Blast furnace works cut S Korea's Posco 2Q steel output


26/07/24
News
26/07/24

Blast furnace works cut S Korea's Posco 2Q steel output

Singapore, 26 July (Argus) — South Korean steelmaker Posco reported lower crude steel output and sales in the second quarter because of refurbishments at its Pohang blast burnace, but a higher operating profit. Posco's crude steel production dropped to 8mn t over April-June, from 8.66mn t in the first quarter and 8.85mn t a year earlier, the company said in an earnings call on 25 July. Sales volume also dipped to 7.86mn t, from 8.23mn t in the previous quarter and 8.48mn t a year earlier. The firm's utilisation rates fell to 79.1pc in the second quarter, from 85.6pc in the first quarter and 87.3pc a year earlier. Posco began maintenance and modernisation of its No.4 blast furnace at Pohang in late April, which has a capacity of around 5.3mn t/yr. But production resumed at the end of June, raising its scrap consumption as reflected in its resumption of regular weekly purchases of Japanese scrap after a three-month halt. The group's combined steel revenue, including Posco and overseas steel facilities, stood at 15.4 trillion won ($11.1bn) in the second quarter. This was largely steady from the previous quarter but down from W16.5 trillion a year earlier. Combined steel operating profit stood at W497bn in the second quarter, up from W339bn in the first quarter, but less than half of W1 trillion a year earlier. Posco reported higher mill margins as the cost of raw materials dropped and sales price increased. But overseas upstream operations reported losses given an influx of cheap imports into the southeast Asian market and lower sales prices. Battery, other expansion plans Revenue from secondary battery unit Posco Future M fell by 20pc on the quarter and 23pc on the year to W915bn. Operating profit stood at W3bn, down from W38bn a quarter earlier and W52bn a year earlier. Posco, while citing a difficult battery materials industry over April-June, said during the earnings call that it is "closely monitoring demand fluctuations." The firm will pace its investment, but it will "not lose out" on any opportunity to invest in essential resources such as lithium whose prices have "hit rock bottom." Posco flagged the approaching US presidential election and shifting strategies of major automakers as factors that will continue affecting the EV supply chain. This was echoed by South Korean battery maker LG Energy Solution , which expects global EV market growth to come in at slightly over 20pc this year, down from 36pc a year earlier. Posco's first domestic lithium hydroxide plant, located at the Yulchon Industrial Complex in Gwangyang, with a capacity of 21,500 t/yr aims to start full operations in February 2025. It will be operated by Posco-Pilbara Lithium Solution, a joint venture between Posco and Australia's lithium miner Pilbara Minerals. The company also expects to finish building a second plant at the same location with similar capacity in September whose full operations will begin in September 2025. Its Argentinian lithium operations will have a total capacity of 50,000 t/yr in the near term, split between phase 1 and phase 2, which will start full operations in April 2025 and June 2026, respectively. Trading firm Posco International also reported that the final stage 4 expansion of its Myanmar offshore gas field will start in July, with about 4mn t/yr of By Tng Yong Li and Joseph Ho Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

EU could launch 'other countries' HRC dumping probe


25/07/24
News
25/07/24

EU could launch 'other countries' HRC dumping probe

London, 25 July (Argus) — The European Commission soon could initiate a dumping investigation on some exporters selling into the 'other countries' quota for hot-rolled coil (HRC), according to multiple market sources. The 'other countries' quota in recent quarters has consistently filled rapidly upon resetting, and this pressure has been intensified by rising Chinese exports since August of last year. Some key 'other countries' sellers have seen the volumes they take from China balloon as a result. Vietnam bought more than 4.2mn t from China in the first six months of this year, compared with about 6mn t in the whole of 2023. China's increased exports has sparked talk that both India and Vietnam may start anti-dumping duty investigations. When announcing its 15pc cap on countries selling into the 'other countries' quota, the commission specifically alluded to the increase in Chinese exports affecting trade flows. Vietnam, Egypt, Japan and Taiwan are by far the largest sellers into the 'other countries' quota, and all of the countries initially exceeded their 141,849t cap quickly when the new quotas took force on 1 July. In April, before the cap was implemented, these four countries amounted for more than half of the 1.4mn t imported by the EU. The 'other countries' quota has essentially been reduced from 940,000 t/quarter to less than 600,000 t/quarter given the new cap. Sources suggested duties could be applied retroactively if the commission finds that material has been dumped. They also suggested it could be difficult to show dumping in some countries, such as Vietnam and Egypt, where domestic prices are often below export levels. A leading producer was gathering information on Egyptian cargoes arriving at EU ports in recent months, a trading firm said. The commission refused to comment on any potential investigation. By Colin Richardson Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

China raises EV, ICE vehicles trade-in subsidies


25/07/24
News
25/07/24

China raises EV, ICE vehicles trade-in subsidies

Beijing, 25 July (Argus) — The Chinese government has raised subsidies to boost trade-in of old internal combustion engine (ICE) vehicles with new energy vehicles (NEV). The subsidy for consumers who trade in an old NEV registered before 30 April 2018 or an ICE vehicle that meets or is below China's national 3 emission standard for a new NEV has doubled to 20,000 yuan from a previous subsidy announced in May . Electric vehicles cost anywhere between Yn50,000 to Yn1mn, with consumers mostly purchasing those in the Yn100,000-200,000 range, according to industry participants. The government is also offering a Yn15,000 subsidy for consumers who trade in an old NEV registered before 30 April 2018 or an ICE vehicle that meets or is below China's national 3 emission standard, and purchase a new ICE vehicle with the displacement below 2.0 litre. Beijing in early March announced a plan to promote the replacement of industrial equipment and consumer goods through large-scale trade-ins, with NEVs making up the main part of the scheme, as part of Beijing's efforts to meet its annual economic growth target of 5pc. China's ministry of finance announced on 3 June that it will allocate Yn6.44bn to local governments to pay the subsidies for vehicle trade-ins in 2024, including Yn107mn to Tianjin, Yn90.81mn to Shanghai, Yn74.61mn to Beijing and Yn66.49mn to Chongqing. The central government announced on 29 May that it will remove purchase restrictions for NEVs during 2024-25, with the capital city Beijing allocating 20,000 additional purchase quotas for NEVs to families without a car. China produced 1.003mn NEVs in June, up by 28pc from the previous year and by 6.7pc from May, with sales increasing by 30pc from a year earlier and by 9.8pc from the previous month to 1.049mn, partly driven by the country's supportive measures, especially the trade-in subsidies. Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Australia’s Origin to expand Eraring battery project


25/07/24
News
25/07/24

Australia’s Origin to expand Eraring battery project

Sydney, 25 July (Argus) — Australian utility Origin will expand the battery energy storage system (BESS) at the site of its 2,880MW Eraring coal-fired power station in News South Wales (NSW), as part of its strategy to pivot to renewable energy. The A$450mn ($294mn) investment will add 240MW of four-hour duration supply to the 460MW, two-hour BESS already under construction as part of the project's first stage, Origin said on 25 July. Agreements for equipment supply and construction have been made with stage two construction to begin in early 2025 before the expansion comes on line during January-March 2027. Equipment will be provided by Finnish engineering firm Wartsila, which is also building the first stage of the BESS. The sanctioning of Eraring's second stage brings the firm's total commitment on storage to 1.5GW, with Origin agreeing in January to outlay A$400mn on a 300MW BESS along with the firm's 550MW Mortlake gas-fired power plant in Victoria. Origin and the NSW Labor state government agreed in May to keep Eraring, Australia's largest single power plant, open for at least two more years as part of a deal to maintain capacity because of delays with replacement projects. Australia is struggling to replace its retiring coal-fired power generation because of cost blowouts and delays for renewable projects. By Tom Major Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Generic Hero Banner

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more